
Description
5 parcels that are permit ready. Lots 1-3 zoned R-2 for duplexes, Lots 4 & 5 zoned R1-8 for single family residences. Water design, SRP and Centurylink fiber designs are completed. Water meter agreement initiated with the city of Mesa. (Water meters can be installed after first building permit is pulled) Lots will require installing water meters, electric, cable and septic for sewer. Duplex building plans included. Parcels included: 220-30-044B, 220-30-044C, 220-30-044D, 220-30-044E and 220-30-044F. Pictured duplex is an example of a completed build using the included designs.
School Information
Description
5 parcels that are permit ready. Lots 1-3 zoned R-2 for duplexes, Lots 4 & 5 zoned R1-8 for single family residences. Water design, SRP and Centurylink fiber designs are completed. Water meter agreement initiated with the city of Mesa. (Water meters can be installed after first building permit is pulled) Lots will require installing water meters, electric, cable and septic for sewer. Duplex building plans included. Parcels included: 220-30-044B, 220-30-044C, 220-30-044D, 220-30-044E and 220-30-044F. Pictured duplex is an example of a completed build using the included designs.
Related Properties
